Document library

Here you can find copies of all of the documents for South Brooks as the project progresses.

Phase Two Consultation (From 28 May 2026)

  • Consultation booklet This is a 36-page booklet containing more information about the South Brooks project.
  • Maps and plans – High-quality versions of the maps within the consultation booklet:
    • Updates and changes – This is a map showing how the plans have changed since Phase One Consultation
    • Mitigation features map – Map showing potential proposed landscape mitigation, enhancement and existing features
    • Cable route options map Map showing routing options for interconnecting cabling and grid connection corridors.
    • Construction and access map Map showing the location of temporary construction compounds and potential access points into the Site during construction and operation.
    • Solar NSIP map – Map showing the proposals for South Brooks Solar Farm in relation to the current site boundaries of other proposed solar NSIPs on Romney Marsh.
  • Preliminary Environmental Information – This takes you to a page where you can view and download the Preliminary Environmental Information, including early versions of key outline management plans.
  • Exhibition boards – This is a digital version of the exhibition boards on display at the public events we are holding. ​
  • Questionnaire – This is a printable version of the questionnaire you can use to share your feedback with us.
  • Online questionnaire – This is a link to the online version of the questionnaire you can use to share your feedback with us.
  • Newsletter – This is a short newsletter to publicise the Phase Two Consultation

Technical webinars

Recordings and slides from the technical webinars (including a summary of the Q&A) will be available on this page once they have taken place. To sign up for a webinar please see the Public Consultation page of this website.

Programme Document

  • Programme Document – This document sets out the proposed project timetable and activities we will undertake during the pre-application period. It is a live document which will be updated through this stage of the DCO process. This includes the Statement of Community Consultation.

 

Historic materials – for reference only

Phase One Consultation (18 September – 30 October 2025)

Launch (9 September 2025)

  • Leaflet – This is a short leaflet to introduce the project.
  • Our early layout – This is the early design of South Brooks which we are seeking your feedback on.